Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • Yale School of Architecture tops ceremonial mace with mini brutalist building
    • Bronx jail designed to be "responsive to the neighborhood"
    • Part 4 – Closet Island Progress – How To Build Drawers The Easiest Way (Plus, The News You’ve Been Waiting For)
    • Self-Portrait in Plan: 8 Architecture Studios Designed By Their Owners
    • Fin lounge chair by Daniel Schofield for NaughtOne
    • What’s Up With My Brother’s River House? When Will The Rest Of It Be Revealed?
    • Seiko exhibition presents "watches that 99 per cent of people don't need"
    • Spring Greens and Purples in the PNW
    Home Decor DesignerHome Decor Designer
    • Home
    • DIY Home Decor
    • Garden Design
    • Decorating
    • Home Improvement
    • Interior Design
    • More
      • Plants & Yards
      • Architecture
      • Design
    Home Decor DesignerHome Decor Designer
    Home»Architecture»Photos reveal construction progress on granite-wrapped Obama Presidential Center museum
    Architecture

    Photos reveal construction progress on granite-wrapped Obama Presidential Center museum

    Team_HomeDecorDesignerBy Team_HomeDecorDesignerApril 17, 2025No Comments3 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    Photos of construction at the Obama Presidential Center Museum Building in Chicago have shown an exterior wrapped in granite panels, as well as the interior of the partially completed uppermost floors.

    The Museum Building was designed by Tod Williams Billie Tsien Architects and joins a number of buildings on the 19-acre Obama Presidential Center campus, also master-planned by the studio.

    Building under construction
    Construction photographs show granite cladding wrapped around the majority of the Museum Building at the Obama Presidential Center

    Designed to resemble “four hands coming together”, the building topped out in June 2024 and is currently receiving its outermost shell, as seen in images shared by the Obama Foundation.

    Grey granite siding largely covers the exterior, while in other areas – such as in cutaway sections on its upper and lower levels – insulating and protective layers are still exposed.

    Building under construction
    The building is designed to resemble four clasped hands

    A February 2025 construction update from the Obama Presidential Center states that hardwood flooring is underway in the building’s interior and that in the Sky Room, a viewing area on the building’s top floors, “crews are preparing to frame the walls around the signature sloped ceiling”.

    Windows also continue to be installed around the uppermost floors, or the Sky Room Vista, which sits beneath the Sky Room.

    Building under construction
    Walls are being framed in the Sky Room viewing area on the upper floors

    Elsewhere on the campus, the wedge-shaped Home Court athletics facility, designed by Moody Nolan, has received partial insulation, and framing continues through the rest of the building.

    At the centre of the campus, the Library and the Forum building are also receiving insulation. The library building is partially buried and will eventually contain a branch of the Chicago Public Library and feature a walkable green roof.


    Obama sports complex

    Read:

    SPF Architects creates Obama Sports Complex from pre-engineered metal structures


    Landscape elements, such as retaining walls and pathways designed under landscape studio Michael Van Valkenburgh Associates are also being installed.

    The remaining site will eventually include a sculpture by landscape architect Maya Lin, public plazas and a vegetable garden dedicated to Eleanor Roosevelt.

    Obama Presidential Center under construction
    Insulating and protective layers on the building’s exterior are still exposed in some areas

    Construction on the campus is expected to be completed in 2026. It will include the Museum Building on the north end, the Presidential Library and Forum building at the centre, and the Home Court building towards the east end.

    Programming will be dedicated to the Obama presidency, as well as hosting community events for the surrounding Jackson Park neighbourhood.

    Each US president has had a dedicated library since Franklin D Roosevelt in the 1940s, built to store the president’s papers and other material. These centers are overseen by the National Archives and Records Administration (NARA).

    Some presidents have received retroactive libraries, including Theodore Roosevelt – the early 20th-century president’s library is currently being constructed in North Dakota by Snøhetta.

    The Obama Foundation has taken a different approach in the centre, choosing to have a private organisation separate from the government and there will be no NARA library on the site. The foundation is working with NARA to digitise the records instead of having a formal library, but these plans are currently on hold.

    The Obama Presidential Center features plentiful landscaping and open space, but has come under some criticism from preservation groups as it is being built on a portion of historic Jackson Park, designed by Frederick Law Olmsted.

    The photography is courtesy of the Obama Foundation

    The post Photos reveal construction progress on granite-wrapped Obama Presidential Center museum appeared first on Dezeen.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleDIY Necklace Organizer (Please Help Me Finish Or Improve Upon This Design!)
    Next Article Lehrer Architects creates tree-covered mausoleum for Hollywood Forever Cemetery
    Team_HomeDecorDesigner
    • Website

    Related Posts

    Architecture

    Yale School of Architecture tops ceremonial mace with mini brutalist building

    June 4, 2025
    Architecture

    Bronx jail designed to be "responsive to the neighborhood"

    June 4, 2025
    Architecture

    Self-Portrait in Plan: 8 Architecture Studios Designed By Their Owners

    June 4, 2025
    Add A Comment
    Leave A Reply Cancel Reply

    Top Posts

    “Yearning for authenticity” central to bolder interior design in 2025

    January 25, 2025

    This week we named the most significant buildings of the 21st-century

    January 11, 2025

    This week we marked art deco's centenary

    May 3, 2025

    Hugh’s Long Flower Border Last Summer

    January 30, 2025

    Dezeen’s top five houses of November 2024

    November 30, 2024
    Categories
    • Architecture
    • Decorating
    • Design
    • DIY Home Decor
    • Garden Design
    • Home Improvement
    • Interior Design
    • Plants & Yards
    Most Popular

    Yale School of Architecture tops ceremonial mace with mini brutalist building

    June 4, 2025

    2024 Holiday Gift Guides – Ideas for Women, Men, & Kids

    November 24, 2024

    Exploring the Choice Between Interior Design Companies and Self-Employed Designers — AKIVA UK Affordable home Interior Design

    November 24, 2024
    Our Picks

    This week the world's tallest 3D-printed building opened in Switzerland

    May 24, 2025

    "Adaptable and timeless" art deco design informs suite at Sea Containers hotel

    April 28, 2025

    My Apologies! {Giveaway + Happy Valentine’s}

    February 14, 2025
    Categories
    • Architecture
    • Decorating
    • Design
    • DIY Home Decor
    • Garden Design
    • Home Improvement
    • Interior Design
    • Plants & Yards
    • Privacy Policy
    • Disclaimer
    • Terms and Conditions
    • About us
    • Contact us
    Copyright © 2024 Homedecordesigner.co.uk All Rights Reserved.

    Type above and press Enter to search. Press Esc to cancel.